Electrical Connections - Bryant 312A Installation, Start-Up, Operating And Service And Maintenance Instructions

2-stage deluxe induced-combustion 4-way multipoise furnace installation, start--up, operating and service and maintenance instructions series 120/c
Table of Contents

Advertisement

BLK
BLK
WHT
WHT
GND
115-VOLT FIELD-
JUNCTION
SUPPLIED
BOX
FUSED
DISCONNECT
Piping should be pressure and leak tested in accordance with
NFGC in the United States or CAN/CSA- -B149.1- -05 in Canada,
local, and national plumbing and gas codes before the furnace has
been connected. After all connections have been made, purge
lines and check for leakage at furnace prior to operating furnace.
If pressure exceeds 0.5 psig (14- -in. wc), gas supply pipe must be
disconnected from furnace and capped before and during supply
pipe pressure test. If test pressure is equal to or less than 0.5 psig
(14- -in. wc), turn off electric shutoff switch located on furnace gas
control valve and accessible manual equipment shutoff valve
before and during supply pipe pressure test. After all connections
have been made, purge lines and check for leakage at furnace
prior to operating furnace.
The gas supply pressure shall be within the maximum and
minimum inlet supply pressures marked on the rating plate with
the furnace burners ON and OFF.

ELECTRICAL CONNECTIONS

WARNING
!
ELECTRICAL SHOCK HAZARD
Failure to follow this warning could result in personal
injury or death.
Blower access panel door switch opens 115- -v power to
control. No component operation can occur. Do not bypass
or close switch with panel removed.
See Fig. 24 for field wiring diagram showing typical field 115- -v
wiring. Check all factory and field electrical connections for
tightness.
Field- -supplied wiring shall conform with the limitations of 63_F
(33_C) rise.
NOTE 2
W
C
FIVE
WIRE
THREE-WIRE
HEATING-
ONLY
W2
COM
W/W1
NOTE 1
Y/Y2
R
CONTROL
BOX
G
24-VOLT
TERMINAL
NOTES: 1.
BLOCK
FURNACE
Fig. 24 - - Field Wiring Diagram
FIELD 24-VOLT WIRING
FIELD 115-, 208/230-, 460-VOLT WIRING
FACTORY 24-VOLT WIRING
FACTORY 115-VOLT WIRING
1-STAGE
THERMOSTAT
Y
R
G
TERMINALS
CONDENSING
UNIT
Connect Y/Y2-terminal as shown for proper operation.
2.
Some thermostats require a "C" terminal connection as shown.
3.
If any of the original wire, as supplied, must be replaced, use
same type or equivalent wire.
!
ELECTRICAL SHOCK AND FIRE HAZARD
Failure to follow this warning could result in personal
injury, death, or property damage.
The cabinet MUST have an uninterrupted or unbroken
ground according to NEC ANSI/NFPA 70- -2006 and
Canadian Electrical Code CSA C22.1 or local codes to
minimize personal injury if an electrical fault should occur.
This may consist of electrical wire, conduit approved for
electrical ground or a listed, grounded power cord (where
permitted by local code) when installed in accordance with
existing electrical codes. Refer to the power cord
manufacturer's ratings for proper wire gauge. Do not use
gas piping as an electrical ground.
!
FURNACE MAY NOT OPERATE HAZARD
Failure to follow this caution may result in intermittent
furnace operation.
Furnace control must be grounded for proper operation or
else control will lock out. Control must remain grounded
through green/yellow wire routed to gas valve and manifold
bracket screw.
115- -V WIRING
Verify that the voltage, frequency, and phase correspond to that
specified on unit rating plate. Also, check to be sure that service
provided by utility is sufficient to handle load imposed by this
equipment. Refer to rating plate or Table 7 for equipment
electrical specifications.
21
FIELD-SUPPLIED
FUSED DISCONNECT
208/230- OR
460-VOLT
THREE
PHASE
208/230-
VOLT
SINGLE
PHASE
GND
WARNING
CAUTION
A95236

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents