Installing The Server Into The Rack; Lift Handles Mounted - HP rp7420 Service Manual

Hp 9000 rp7420 server - user service guide, fifth edition
Hide thumbs Also See for rp7420:
Table of Contents

Advertisement

Figure 2-1 1 Lift Handles Mounted
6.
Continue to pull the handles apart until the spring plunger snaps into final position. The
spring plunger drops down into the recess position.
7.
Ensure that the handles are secure by pressing the handles together and moving back and
forth.
8.
For the other handle, repeat steps 3 through 7.
9.
To lift the server, rotate the handles 90 degrees to horizontal position.
NOTE:
Kit.
10. After moving the server, remove the lift handle panels from the chassis and reinstall the
server covers and front bezel. Refer to the installation guide, HP J1530B rack installation kit.

Installing the Server Into the Rack

Any server that is to be installed into a rack is shipped with equipment slides. With every set of
slides comes an installation guide: Installation Guide, HP J1530B Rack Installation Kit.
If installing the system in a rack, see the Installation Guide, HP J1530B Rack Installation
Installing the Server Into the Rack
39

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

9000 rp7420

Table of Contents