Bosch WVT 52458 Operating & Installation Instructions Manual page 43

Table of Contents

Advertisement

Operating Instructions
Transport e.g. when moving
Before transporting the washer-dryer:
Turn off the water tap,
Drain any residual washing solution (refer to Page 30),
Release the water pressure in the supply hose(refre to
Page 30),
Disconnect the washer-dryer from the mains,
Dismantle the supply and drainage hose,
Install the transport bolts.
Having transported the appliance and ensured proper ins-
tallation and connection, allow the Draining program to
run through before starting the first wash program.
Preparing and inserting the transport bolts
Remove the covers C.
Remove the rear panel D (see page 38), prepare the
transport bolt.
Insert and tighten the bolts.
Reinstall the rear cover D.
41

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Wvt52050

Table of Contents