Figure 87. Battery Backup Unit Operations - Intel SC5650BCDP Software User's Manual

Software user's guide
Hide thumbs Also See for SC5650BCDP:
Table of Contents

Advertisement

The BBU operations appear, as shown in
BBU operation also may appear in a new pop-up window).
Starting a Learn Cycle Manually
To start the learn cycle properties manually, perform the following steps:
138
3. Click the Go To -> BBU tab.

Figure 87. Battery Backup Unit Operations

4. Select Set Learn Cycle Properties.
The options appear in the right frame.
5. To enable automatic learn cycles, click Enable automatic learn cycles and click Go.
You can delay the start of the next learn cycle by up to 7 days (168 hours) using the
Delay next learn cycle field.
6. To disable automatic learn cycles, click Disable automatic learn cycles and click Go.
You can start the learn cycles manually. In addition, you can check the box next to the
field Remind me when to start a learn cycle to receive a reminder to start a manual
learn cycle.
1. Click the Physical tab to open the physical view.
2. Select the BBU icon in the left panel.
3. Click the Go To -> BBU tab.
The BBU operations appear, as shown in
version, the BBU operation also may appear in a new pop-up window).
4. Click Start Learn Cycle and click OK.
Figure 87
(Depending on different utility version, the
Figure 87
(Depending on different utility
®
Intel
RAID Software User's Guide

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents