Power-On Tests; Power-Up And Power-Down Procedures; Power-Up Procedure; Power-Down Procedure - HP D7171A - NetServer - LPr Installation Manual

Hp netserver lh 3000 installation guide
Hide thumbs Also See for D7171A - NetServer - LPr:
Table of Contents

Advertisement

Chapter 2
NOTE
Each 16-amp PDU can accommodate a maximum of two
NetServers.
When the proper power supply is available, connect the NetServer to the AC
power source.

Power-On Tests

The HP NetServer runs a set of diagnostic tests when it is first connected to a
power source. If the LH 3000r passes the tests, you will see:
HP NetServer
LH 3000r
If the HP NetServer does not pass the tests, you will see:
<error code>
Display now?
Press Enter to view the error message. Refer to the HP NetServer Navigator
CD-ROM to get an interpretation of the error code.

Power-Up and Power-Down Procedures

Power-Up Procedure

1. Ensure the HP NetServer's power cord is connected to a power source, and
the LED on each power supply is flashing green.
2. Press the power switch when prompted by the operating system.
CAUTION
The power supplies continue to provide standby voltage to the
NetServer until the power cord is disconnected.

Power-Down Procedure

Follow this procedure when installing non-hot-swap and non-hot-plug
components, such as tape drives and non-hot-plug PCI boards.
1. Log off all users and back-up files.
Controls, Ports, and Indicators
25