IBM 88728AU - System x3950 - 8872 Datacenter High Availability Installation Manual page 36

Installation guide
Table of Contents

Advertisement

3. Connect the SMP Expansion cables to node 1:
4. Connect the SMP Expansion cables to node 2:
5. Route any remaining cables through the cable-management arms.
6. Secure the cables in the cable-management arms with the hook-and-loop straps
7. Configure the scalable partition. See "Using the Scalable Partition Web
Four-node configuration
A four-node configuration requires six 2.3-m (7.6-foot) XpandOnDemand Scalability
cable kits. To cable a four-node configuration for up to 16-way operation, complete
the following steps:
1. Remove the protective covers from the connectors on the ends of the cables.
2. Label each end of the SMP Expansion cables according to where it will be
24
IBM System x3950 Type 8872 and System x3950 E Type 8874: Installation Guide
a. Connect one end of an SMP Expansion cable to port 1 on node 1; then,
route the cable through the node 1 cable-management arm. Use a 2.3-m
(7.6-foot) SMP Expansion cable for this connection.
b. Connect one end of an SMP Expansion cable to port 2 on node 1; then,
route the cable through the node 1 cable-management arm. Use a 2.3-m
(7.6-foot) SMP Expansion cable for this connection.
a. Locate the SMP Expansion cable that is connected to port 1 on node 1;
then, connect the opposite end of the cable to port 1 of node 2. Next, route
the cable through the node 2 cable-management arm.
b. Locate the SMP Expansion cable that is connected to port 2 on node 1;
then, connect the opposite end of the cable to port 2 of node 2. Next, route
the cable through the node 2 cable-management arm.
that come with the server.
Interface" on page 51.
Protective cover
connected to each server. See the following illustration.
Node 1
Node 2

Advertisement

Table of Contents
loading

This manual is also suitable for:

X3950 8872X3950 e 8874

Table of Contents