Installing The Power Supply; Finishing Up - TYAN THUNDER K8S PRO Manual

Table of Contents

Advertisement

10Mbps
Activity
10Mbps
Left Right
100Mbps
Activity
100Mbps
1000Mbps
Activity
1000Mbps
2.40 – Installing the Power Supply
There are two power connectors on your Thunder K8S Pro S2882. The Thunder K8S Pro
S2882 requires that you have an EPS12V power supply that has a 24-pin and an 8-pin
power connector. Please be aware that ATX 2.x, ATX12V and ATXGES power supplies
are not compatible with the board and can damage the motherboard and/or CPU(s).
Disconnect power supply from electrical outlet
1. Connect the EP12V 8-pin power connector
2. Connect the EP12V 24-pin power connector
3. Connect power cable to power supply to power outlet
Make sure you have connected both connectors before attempting to apply power
to the board.
YOU MUST unplug the power supply before plugging the power cables to
NOTE
motherboard connectors.
2.41 – Finishing Up
Congratulations on making it this far! You're finished setting up the hardware aspect
of your computer. Before closing up your chassis, make sure that all cables and wires
are connected properly, especially IDE cables and most importantly, jumpers. You
may have difficulty powering on your system if the motherboard jumpers are not set
correctly.
In the rare circumstance that you have experienced difficulty, you can find help by
asking your vendor for assistance. If they are not available for assistance, please find
setup information and documentation online at our website or by calling your
vendor's support line.
10/100/1000 Mbps LAN Link/Activity LED Scheme
Speed
Link
Green (Blink)
Link
Link
Green (Blink)
http://www.TYAN.com
Left LED
Green
Off
Off
Green
36
Right LED
Off
Off
Yellow
Yellow (Blink)
Yellow
Yellow (Blink)

Advertisement

Table of Contents
loading

This manual is also suitable for:

S2882

Table of Contents