Seiko 6A32 Parts Catalogue /Technical Manual page 14

Technical guide
Hide thumbs Also See for 6A32:
Table of Contents

Advertisement

TECHNICAL GUIDE
Installation positions • Lubrication points • Remarks
Reassembly (9)
Reassemble the date dial
guard.
The date dial guard is fastened at the three positions
(A, B and C) that are engaged with the date dial guard
fixing guards and guide pins of the main plate.
<Reassembly>
1. Turn the date dial guard clockwise until it is halfway
engaged with the date dial guard fixing guards at
the A, B and C positions each.
2. While further turning the date dial guard clockwise,
press the date dial guard guide holes toward the
guide pins of the main plate at the A and B positions
until the date dial guard fixing guards are completely
engaged with the main plate.
<Disassembly>
1. Using a pair of tweezers, lift the A position of the
date dial guard to disengage the date dial guard
guide hole and the guide pin of the main plate.
Turn the date dial guard counterclockwise until it
overrides the guide pins of the main plate.
2. Using a pair of tweezers, lift the B position of the
date dial guard to disengage the date dial guard
guide hole and the guide pin of the main plate.
Turn the date dial guard counterclockwise until it
overrides the guide pins of the main plate.
3. Turn the date dial guard counterclockwise until it is
disengaged from the date dial guard fixing guards
of the main plate. And then remove the date dial
guard.
Date dial guard fixing guard (B positions)
14
❇ Install the parts, paying attention to the following:
mounting positions,
direction of mounting.
Guide pin (B position)
Date dial guard fixing guard
(C positions)
C
B
Guide pin (A position)
Date dial guard fixing guard (A positions)
Cal. 6A32A
A

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

6a32a

Table of Contents