TECHNICAL GUIDE
Installation positions • Lubrication points • Remarks
Reassembly (6)
Reassemble the circuit block.
Reassembly (7)
Reassemble the switch lever.
12
❇ Install the parts in the number order shown in the illustration below,
paying attention to the following:
mounting positions,
direction of mounting.
❇ Install the parts in the number order shown in the illustration below,
paying attention to the following:
mounting positions,
direction of mounting.
The coil block is closely positioned.
Be careful not to cut the coil wire.
1 Circuit block
2 Circuit block screw
3 Insulator for circuit block
1 Switch lever
2 Switch lever springs (4 pieces)
Cal. 6A32A