Chapter 2 System Safety; Overview; Warnings And Precautions; Preparing For Setup - Supermicro SC826E1-R800LP User Manual

Sc826 chassis series
Table of Contents

Advertisement

2-1

Overview

This chapter provides a quick setup checklist to get your chassis up and running.
Following the steps in order given should enable you to have your chassis setup and
operational within a minimal amount of time. This quick set up assumes that you are
an experienced technician, familiar with common concepts and terminology.
2-2

Warnings and Precautions

You should inspect the box the chassis was shipped in and note if it was damaged
in any way. If the chassis itself shows damage, file a damage claim with carrier
who delivered your system.
Decide on a suitable location for the rack unit that will hold that chassis. It should
be situated in a clean, dust-free area that is well ventilated. Avoid areas where heat,
electrical noise and electromagnetic fields are generated.
You will also need it placed near at least one grounded power outlet. When con-
figured, the SC826 chassis includes one power supply. "R" models (i.e. SC826S-
R700V Chassis) include a redundant power supply and require two grounded
outlets.
2-3

Preparing for Setup

The SC826 Chassis includes a set of rail assemblies, including mounting brackets
and mounting screws you will need to install the systems into the rack. Please read
this manual in its entirety before you begin the installation procedure.
Chapter 2
System Safety
2-1
Chapter 2: System Safety

Advertisement

Table of Contents
loading

Table of Contents