Verifying Switch Operation - Cisco WS-C2950T-48-SI Hardware Installation Manual

Catalyst 2950 series switch
Hide thumbs Also See for WS-C2950T-48-SI:
Table of Contents

Advertisement

Verifying Switch Operation

If you want to connect a terminal to the switch console port, you need to provide an RJ-45-to-DB-25
female DTE adapter. You can order a kit (part number ACS-DSBUASYN=) with that adapter from Cisco.

Verifying Switch Operation

Before installing the switch in a rack, on a wall, or on a table or shelf, you should power on the switch
and verify that the switch passes POST. See Section 3, "Running Express Setup," in the getting started
guide for the steps required to connect a PC to the switch console port and to power on the switch.
While the switch powers on, it automatically begins POST, a series of tests that verifies that the switch
functions properly. When the switch begins POST, the system LED is off. POST has completed
successfully when the SYST and STAT LEDs are green.
If a switch fails POST, the System LED turns amber. If POST fails, see
to determine a course of action.
Note
POST failures are usually fatal. Call Cisco Systems if your switch does not pass POST.
After a successful POST, follow these steps:
Turn off power to the switch.
Step 1
Disconnect the cables.
Step 2
Determine where you want to install the switch.
Step 3
Catalyst 2950 Switch Hardware Installation Guide
2-6
Six number-8 Phillips flat-head screws for attaching the brackets to the switch
Four number-8 Phillips truss-head screws for attaching the brackets to the switch
Four number-12 Phillips machine screws for attaching the brackets to a rack
One cable guide and one black Phillips machine screw for attaching the cable guide to one of
the mounting brackets
One RPS connector cover and two number-4 pan-head screws
DC-switch kit containing these items:
One DC terminal block plug (also called a terminal block header)
One ground lug
Two number-10-32 screws for attaching the ground lug to the switch
Two 23-inch rack-mounting brackets (with 1-inch spacing for telco racks)
Four number-8 Phillips truss-head screws for attaching the brackets to the switch
Two number-12 Phillips machine screws for attaching the brackets to a rack
The DC-switch kit ships only with the Catalyst 2950G-24-EI-DC or Catalyst 2950ST-24
Note
LRE 997 switch.
One RJ-45-to-DB-9 adapter cable
Product ownership registration card
Chapter 2
Installation
Chapter 3, "Troubleshooting,"
OL-6156-01

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents