Mounting The Switch In A Standard 19" Rack; Power On; Power Failure - D-Link DES-3226L Manual

Managed 24-port 10/100mbps and 2ge ports layer 2 ethernet switch
Hide thumbs Also See for DES-3226L:
Table of Contents

Advertisement

DES-3226L Layer 2
Fast Ethernet Switch User's Guide

Mounting the Switch in a standard 19" rack.

Figure 2-3. Installing Switch in a rack

Power On

Plug one end of the AC power cord into the power connector of the Switch and the other end
into the local power source outlet.
After the Switch is powered on, the LED indicators will momentarily blink. This blinking of
the LED indicators represents a reset of the system.

Power Failure

As a precaution, in the event of a power failure, unplug the Switch. When power is resumed,
plug the Switch back in.
10

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents