3
Hardware Installation
The S7900E series are designed for indoor application.
Confirming Installation Preparations
Make sure that you have read Chapter 2 carefully
All requirements introduced in Chapter 2 are satisfied.
Installation Flowchart
Figure 3-1 Installation flowchart
Start
Start
Mount the switch to
Mount the switch to
the designated position
the designated position
Connect the grounding cables
Connect the grounding cables
Install modules of the switch
Install modules of the switch
Connect the power cables
Connect the power cables
Connect the interface cables
Connect the interface cables
Route and bind the cables
Route and bind the cables
Check the installation
Check the installation
End
End
3-1