Omron E5CK User Manual page 64

Digital controller (programmable type)
Hide thumbs Also See for E5CK:
Table of Contents

Advertisement

CHAPTER 4 APPLIED OPERATION
F Relationship with
the number of
steps
F When the rate of
rise is set to "0"
JRunning the ramp
rise rate setup
program
F Changing
parameters
4–8
Number of steps = even number
Step
Ramp step
After change
Before
change
Switching point
Before change
After change
Step N
Number of steps = odd number
Step N is skipped.
N
N-1
Soak step
Step N
Step N+1
N+1
Soak step
Time
Step N+1

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents