3-4-4. Test Operation

Perform the test operation of the indoor unit.
(1)
(4)

3

4
(6)
En-40
(3)
(2)
(5)
(1) Tap the MENU button.
(2) Tap the [Maintenance].
(3) Tap the [Test Operation].
(4) Tap the group or R.C.G to display a confirmation pop-up.
No.
Item
Performs the test operation for the
Group

indoor unit of the tapped group.
Displays the list of R.C.G. set in the
Group
group. When R.C.G. is tapped, test

expansion
operation is performed for the indoor
unit of R.C.G.
Batch test
Performs the test operation for all
operation
3
indoor units.
button
Switches over between the monitoring
Display switch-
point display and 50 units display
4
over
alternately.
(5) Tap the [OK] button.
(6) Tap the [End].
Description