Initial Setting - Fujitsu UTY-DCGYZ3 Operation Manual

Central remote controller
Table of Contents

Advertisement

1-5. Initial Setting
After Central remote controller installation work is complete, perform initial setting by the following procedure before
starting to use the system.
Note
If the power is turned off within 5 minutes of finishing the settings, the settings may not be saved.
Turn on the power
(Breaker ON)
Initial setting start
Initial setting end
Operation start
(Refer to Chap. 2.)
En-12
Only when the power is turned on for the first time or immediately after
initialization is set, the following wizard are displayed in wizard format.
Perform the settings.
(1) Language Setting→Refer to 3-5-1(4).
(2) Panel Calibration→Refer to 3-3-2(4).
(3) Central Controller Address Setting→Refer to 3-5-2(4).
(4) Indoor Unit Registration→3-5-3-1 Address Number Registration.
(5) Date Setting→Refer to 3-3-4-1, 3-3-4-2.
Monitoring screen is displayed. Perform the settings as necessary.→Refer to
Chap. 3.
Air conditioning starts on the Monitoring screen.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Uty-dcggz3Uty-dcgyz18432884554881

Table of Contents