Cooling Sequence Of Operation; Continuous Blower; Intermittent Blower; No Outdoor Air Options - York WW-15 Installation Manual

Gas/electric single package air conditioners
Table of Contents

Advertisement

175244-BIM-A-0706
tion is available and, if so, which components to ener-
gize.
For gas heating, the UCB monitors the "W1" call but
does not handle the operation of the gas furnace. An
ignition control board controls the gas heater operation.
For electric heat units, the UCB passes the call to the
electric heater.
In both cases, when the "W1" call is sensed, the indoor
air blower is energized following a specified heating
delay.
If at any time a call for both heating and cooling are
present, the heating operation will be performed. If
operating, the cooling system is halted as with a com-
pletion of a call for cooling. Heating always takes prior-
ity.

COOLING SEQUENCE OF OPERATION

CONTINUOUS BLOWER

By setting the room thermostat fan switch to "ON," the
supply air blower will operate continuously.

INTERMITTENT BLOWER

With the room thermostat fan switch set to "AUTO" and
the system switch set to either the "AUTO" or "HEAT"
settings, the blower is energized whenever a cooling or
heating operation is requested. The blower is ener-
gized after any specified delay associated with the
operation.
When energized, the indoor blower has a minimum run
time of 30 seconds. Additionally, the indoor blower has
a delay of 10 seconds between operations.

NO OUTDOOR AIR OPTIONS

When the thermostat calls for the first stage of cooling,
the low-voltage control circuit from "R" to "Y1" and "G"
is completed. For first stage cooling, compressor #1,
condenser fan motor #1, and condenser fan motor #2
(if the ambient temperature is above 60ºF), is ener-
gized. After completing the specified fan on delay for
cooling, the UCB will energize the blower motor.
When the thermostat calls for the second stage of cool-
ing, the low-voltage control circuit from "R" to "Y2" is
completed. Compressor #2, condenser fan motor #3,
and condenser fan motor #4 (if the ambient tempera-
Unitary Products Group
ture is above 60ºF), is energized, provided it has not
been locked-out.
If there is an initial call for both stages of cooling, the
UCB will delay energizing compressor #2 by 30 sec-
onds in order to avoid a power in rush.
Once the thermostat has been satisfied, it will de-ener-
gize Y1 and Y2. If the compressors have satisfied their
minimum run times, the compressors and condenser
fans are de-energized. Otherwise, the unit operates
each cooling system until the minimum run times for
the compressors have been completed. Upon the final
compressor de-energizing, the blower is stopped fol-
lowing the elapse of the fan off delay for cooling.
To be available, a compressor must not be locked-out
due to a high or low-pressure switch or freezestat trip
and the anti-short cycle delay (ASCD) must have
elapsed.

ECONOMIZER WITH SINGLE ENTHALPY SENSOR -

When the room thermostat calls for "first-stage" cool-
ing, the low voltage control circuit from "R" to "G" and
"Y1" is completed. The UCB energizes the blower
motor (if the fan switch on the room thermostat is set in
the "AUTO" position) and drives the economizer damp-
ers from fully closed to their minimum position. If the
enthalpy of the outdoor air is below the setpoint of the
enthalpy controller (previously determined), "Y1" ener-
gizes the economizer. The dampers will modulate to
maintain a constant supply air temperature as moni-
tored by the discharge air sensor. If the outdoor air
enthalpy is above the setpoint, "Y1" energizes com-
pressor #1, condenser fan motor #1, and condenser
fan motor #2 (if the ambient temperature is above
60°F).
When the thermostat calls for "second-stage" cooling,
the low voltage control circuit from "R" to "Y2" is com-
pleted. The UCB energizes the first available compres-
sor If the enthalpy of the outdoor air is below the
setpoint of the enthalpy controller (i.e. first stage has
energized the economizer), "Y2" will energize com-
pressor #1. If the outdoor air is above the setpoint, "Y2"
will energize compressor #2.
Once the thermostat has been satisfied, it will de-ener-
gize Y1 and Y2. If the compressors have satisfied their
minimum run times, the compressors and condenser
fans are de-energized. Otherwise, the unit operates
each cooling system until the minimum run times for
the compressors have been completed. Upon the final
47