Sign In
Upload
Manuals
Brands
York Manuals
Air Conditioner
J ZJ Series
York J ZJ Series Manuals
Manuals and User Guides for York J ZJ Series. We have
2
York J ZJ Series manuals available for free PDF download: Instruction Manual
York J ZJ Series Instruction Manual (76 pages)
Brand:
York
| Category:
Air Conditioner
| Size: 2.92 MB
Table of Contents
Table of Contents
1
General
2
Installation
5
Preceding Installation
5
Limitations
5
Unit Shipping Bracket
5
Condenser Covering
5
Compressor Section
5
Component Location (J10ZJ Shown)
6
Location
7
Rigging and Handling
7
J06 Thru 12ZJ Unit Limitations
7
Weights and Dimensions
8
Unit 4 Point Load Weight
8
Unit 6 Point Load Weight
8
Center of Gravity
8
J06 Thru 12ZJ Unit Accessory Weights
9
J06 Thru 10ZJ Physical Dimensions
9
J12ZJ Physical Dimensions
10
J06 Thru 12ZJ Unit Physical Dimensions
11
J06 Thru 12ZJ Unit Clearances
11
J06 Thru 12ZJ Unit Bottom Duct Openings
12
J06 Thru 12ZJ Unit Electrical Entry
13
J06 Thru 10ZJ Unit Side Duct Openings
13
Side Duct Dimensions
14
J12ZJ Unit Side Duct Openings
14
J06 Thru 12ZJ Unit Left/End Duct Opening
14
Left/End Duct Dimensions
15
J06 Thru 12ZJ Roof Curb
15
J06 Thru 12ZJ Transition Roof Curb
15
Ductwork
16
Side Panels
16
Condensate Drain
16
Side Panels with Hole Plugs
16
Return Downflow Plenum with Panel
16
Discharge Panel in Place
16
Save Side Panels for Economizer Hood Tops
16
Compressors
17
Filters
17
Power and Control Wiring
17
Condensate Drain
17
Field Wiring Disconnect - Cooling Unit With/Without Electric Heat and All Units with VFD Option
18
Field Wiring Disconnect - Cooling Unit with Gas Heat Without VFD Option
19
Control Wire Sizes
20
Typical Electronic Thermostat Field Wiring
20
Electrical Data
21
Physical Data
29
Optional Electric Heat
31
Optional Gas Heat
31
Electric Heat Minimum Supply Air
31
Side Entry Gas Piping
31
Gas Pipe Sizing - Capacity of Pipe
32
Gas Heat Minimum Supply Air
32
Bottom Entry Gas Piping
32
Options/Accessories
33
Optional Variable Air Volume (VAV)
34
Optional Hot Gas Bypass (HGBP)
36
Economizer Sequences
36
Dry Bulb Changeover
36
Single Enthalpy Changeover
36
Dual Enthalpy Changeover
36
Auto
36
Simplified VFD Wiring
36
Free Cooling Operation
37
Power Exhaust
37
Smart Equipment™ Economizer Board Details
38
SE-ECO1001-0 Economizer Controller
38
Supply Air Limitations
41
Belt Adjustment
42
Altitude/Temperature Correction Factors
43
Airflow Performance
45
Airflow Performance - Side Duct Application
45
Airflow Performance - Bottom Duct Application
47
RPM Selection
48
Air Balance
49
Checking Air Quantity
49
Indoor Blower Specifications
49
Power Exhaust Specifications
49
Dry Coil Delta P
50
Motor Sheave Datum Diameters
51
Operation
52
Cooling Sequence of Operation
52
Additional Static Resistance
52
Cooling Operation Errors
54
Electric Heating Sequence of Operations
55
Electric Heat Operation Errors
55
Electric Heat Limit Setting
55
Gas Heating Sequence of Operations
56
Gas Heating Operation Errors
56
Electric Heat Anticipator Setpoints
56
Gas Heat Limit Control Settings
57
Start-Up (Cooling)
58
Start-Up (Gas Heat)
58
Gas Heat Anticipator Setpoints
58
Checking Gas Heat Input
59
Gas Rate Cubic Feet Per Hour
59
Charging the Unit
60
Gas Heat Stages
60
Typical Flame
60
Typical Gas Valve
60
Control Board Navigation Components
61
Smart Equipment™ Firmware Version 3.3 Basic Unit Control Board Navigation Examples
62
Smart Equipment™ UCB Details
64
Unit Control Board
64
Cable for FC Buses and SA Buses in Order of Preference . 70 32 Ignition Control Flash Codes
70
Start-Up Sheet
71
Advertisement
York J ZJ Series Instruction Manual (64 pages)
Brand:
York
| Category:
Air Conditioner
| Size: 2.46 MB
Table of Contents
Table of Contents
1
General
2
Installation
5
Preceding Installation
5
Unit Shipping Bracket
5
Condenser Covering
5
Compressor Section
5
Limitations
6
Component Location (JA3ZJ Shown)
6
Location
7
Rigging and Handling
7
JA3 Thru A5ZJ Unit Limitations
7
Ja3Zj
7
Ja4Zj
7
Ja5Zj
7
Weights and Dimensions
8
JA3 Thru A5ZJ Unit Accessory Weights
8
Unit 4 Point Load Weight
8
Unit 6 Point Load Weight
8
Center of Gravity
8
Front
8
JA3 Thru A4ZJ Physical Dimensions
9
C D E F
9
JA5ZJ Physical Dimensions
10
JA3 Thru A5ZJ Unit Physical Dimensions
11
JA3 Thru A5ZJ Unit Clearances
11
JA3 Thru A5ZJ Unit Bottom Duct Openings
12
Right
12
Left
12
Side Duct Dimensions
13
JA3 Thru A5ZJ Unit Electrical Entry
13
JA3 Thru A5ZJ Unit Side Duct Openings
13
Left/End Duct Dimensions
14
JA3 Thru A5ZJ Unit Left/End Duct Opening
14
JA3 Thru A5ZJ Roof Curb
14
Ductwork
15
JA3 Thru A5ZJ Transition Roof Curb
15
Side Panels with Hole Plugs
15
Side Panels
16
Condensate Drain
16
Compressors
16
Return Downflow Plenum with Panel
16
Discharge Panel in Place
16
Save Side Panels for Economizer Hood Tops
16
Filters
17
Power and Control Wiring
17
Field Wiring Disconnect
18
Control Wire Sizes
19
Typical Control Wiring
19
Electrical Data
20
Physical Data
24
Optional Electric Heat
25
Electric Heat Minimum Supply Air
25
Optional Gas Heat
26
Gas Pipe Sizing - Capacity of Pipe
26
Side Entry Gas Piping
26
Bottom Entry Gas Piping
26
Gas Heat Minimum Supply Air
27
Options/Accessories
28
Economizer Sequences
29
Dry Bulb Changeover
29
Single Enthalpy Changeover
29
Dual Enthalpy Changeover
29
Auto
29
Free Cooling Operation
29
Power Exhaust
30
Smart Equipment™ Economizer Board Details
31
SE-ECO1001-0 Economizer Controller
31
Supply Air Limitations
34
Altitude/Temperature Correction Factors
35
Belt Adjustment
35
Altitude/Temperature Correction Factors
36
Airflow Performance
38
Airflow Performance - Side Duct Application
38
Airflow Performance - Bottom Duct Application
39
Air Balance
40
Checking Air Quantity
40
RPM Selection
40
Indoor Blower Specifications
40
Power Exhaust Specifications
40
Dry Coil Delta P
41
Motor Sheave Datum Diameters
42
Additional Static Resistance
43
Operation
44
Cooling Sequence of Operation
44
Cooling Operation Errors
44
Electric Heating Sequence of Operations
45
Electric Heat Operation Errors
46
Electric Heat Limit Setting
46
Electric Heat Anticipator Setpoints
46
Gas Heating Sequence of Operations
47
Gas Heating Operation Errors
47
Start-Up (Cooling)
48
Gas Heat Anticipator Setpoints
48
Start-Up (Gas Heat)
49
Checking Gas Heat Input
49
Gas Rate Cubic Feet Per Hour
50
Charging the Unit
51
Control Board Navigation Components
51
Gas Heat Stages
51
Typical Flame
51
Typical Two Stage Gas Valve
51
Smart Equipment™ UCB Details
52
Unit Control Board
52
Cable for FC Buses and SA Buses in Order of Preference . 58 31 Ignition Control Flash Codes
58
Start-Up Sheet
59
5803641-Jim-B-0620
64
Advertisement
Related Products
York J Series
York JVOH400VAEMBQ
York JVOH560VAEMBQ
York JVOH820VAEMBQ
York JVOH880VAEMBQ
York JDOH Series
York JDOH120HSEF0AQ
York J20DJ
York J15DJ
York J12ZJ
York Categories
Air Conditioner
Heat Pump
Chiller
Furnace
Air Handlers
More York Manuals
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL