Inspect The Cable And Cable Pulleys - Terex Genie Superlift SLA-20 Service Manual

Table of Contents

Advertisement

Section 3 • Scheduled Maintenance Procedures
CHECKLIST C PROCEDURES
C-4
Inspect the Cable and Cable
Pulleys
Genie specifications require that this procedure be
performed every 1000 hours or annually,
whichever comes first.
Detection of damage to cable or pulleys is
essential for safe machine operation. An unsafe
working condition exists if these components are
damaged and do not operate smoothly. The
inspection of this system allows the inspector to
identify changes in the operating condition that
might indicate damage.
Note: The mast must be disassembled during the
annual inspection of the machine, otherwise the
cable, cable pulleys and mast rollers are only
partially visible for inspection.
1 Disassemble the mast assembly. Refer to
Repair Procedures 2-1, How to Disassemble
the Mast Assembly.
3 - 14
2 Visually inspect the cable and components for
the following:
·
frayed or broken wire strands
·
kinks in the cable
·
corrosion
·
paint or foreign materials
·
split or cracked swagged end(s)
·
upper and lower mounting brackets are
properly secured
·
no broken or damaged pulleys
·
no unusual or excessive pulley wear
·
no broken or damaged mast rollers
·
no unusual or excessive mast roller wear
3 Assemble the mast assembly. Refer to Repair
Procedures 2-1, How to Assemble the Mast
Assembly.
Superlift Advantage
February 2009
Bodily injury hazard. Beware of
sharp edges. Wear protective
gloves when performing this
procedure.
Part No. 115407
REV A

Advertisement

Table of Contents
loading

Table of Contents