Toshiba MMY-MUP0721FT6P-UL Service Manual page 351

Table of Contents

Advertisement

No.
Part
2 Attachment
1) Fix the control P.C. board to the card edge
2) Connect the connectors disconnected in
3) DIP switch SW01 and SW03 should be set
4) Attach the electrical control box cover.
Work procedure
spacers. (4 places)
item 1-2) as before.
For connectors, check there is no missing
or contact failure.
according to the table below.
(Refer to 1. of 2 Attachment)
- 351 -
Remarks
SW01
(Factory setting)
ON
OFF
1 2 3 4

Advertisement

Table of Contents
loading

Table of Contents