IBM 5394 Manual page 31

Remote control unit
Table of Contents

Advertisement

Table 3 (Page 1 of 2). Cable Wrap Test Description for the V.35 Interface
Test
SRC
Test
Instructions
Number
Level
600000
Default SRC that appears in field
El
at entry into the Dedi-
cated mode. Press the Enter key to start the test selected in
field
II.
61
610000
Dedicated test 61 (the extended communications test) is in
progress.
61
610004
1
Prompt. To start the phase A wrap test, disconnect the com-
munications cable from the modem or DCE. Set switches 1
and 3 to the TEST position and switch 2 to the OPER position.
Press the Enter key.
61
610004
2
Prompt. To start the phase B wrap test, set switches 1 and 2 to
the TEST position and switch 3 to the OPER position. Press the
Enter key.
61
610005
Prompt. Make sure that the communications cable is con-
nected to the back of the modem or DCE and that all three
switches are in the OPER position. Set up for local loopback
testing and press the Enter key. If you cannot set up for this
test, press the Error Reset key.
61
610006
Prompt. Set up for a remote modem or DCE loopback test and
press the Enter key. If you cannot set up for this test, press the
Error Reset key.
61
610007
3
The test sequence has ended. The 5394 passed the cable wrap
test; local loopback is not possible for this configuration.
61
610007
4
The test sequence has ended. Local loopback passed; remote
loopback is not possible for this configuration.
610007
6
The test sequence has ended. Local and remote loopback
tests passed.
61
618DXX
3
The cable wrap test failed on interchange lines of a V.35 com-
munications cable.
61
618EXX
3
The cable wrap test failed on phase A lines of a V.35 comm uni-
cations cable.
61
618FXX
3
The cable wrap test failed on phase B lines of a V.35 comm uni-
cations cable.
61
6180XX
4
Cable wrap test passed, but local loopback test failed.
61
6180XX
6
Remote loopback test failed.
63
630000
Dedicated test 63 (cable wrap) is in progress.
63
630004
1
Prompt. To start the phase A wrap test, disconnect the com-
munications cable from the modem or DCE. Set switches 1
and 3 to the TEST position and switch 2 to the OPER position.
Press the Enter key.
63
630004
2
Prompt. To start the phase B wrap test, set switches 1 and 2 to
the TEST position and switch 3 to the OPER position. Press the
Enter key.
24
V.35 Supplement RPO 800725 and RPO 800726

Advertisement

Table of Contents
loading

Table of Contents