Viessmann VITOROND 100 VR1 40 Installation And Service Instructions Manual page 31

Oil-fired boiler, heating input 161 to 245 mbh, 47 to 72 kw
Table of Contents

Advertisement

Vitorond 100, VR1 40 to 63, 161 to 245 Installation and Service
Electrical Connections (with Hydrostat 3250-Plus Control)
WARNING
Ensure that the burner cycles ON and OFF on proper
call for heat before leaving the job site. Failure to do so
may lead to boiler runaway situation, which may lead to
property damage, personal injury or death.
CAUTION
A field supplied manual reset high limit control must
be installed at the outlet pipe of the boiler to interrupt
burner operation should the factory supplied high limit
control fail. This field supplied high limit control must
be set 20°F (7°C) above the setting of the factory
supplied high limit control. The setting of this field
supplied high limit control must never be greater than
220°F (104°C).
Beckett NX burner with GeniSys Control
Legend
A Power supply, provide disconnect means and
overload protection as required.
B Control case must be connected to earth ground.
Use grounding provided.
C B1 is a in. tab terminal.
D Circulator
E Temperature limit control (when required by local
jurisdiction) (field supplied)
*
Field supplied
Installations must follow these codes and requirements:
-
National Electrical Code, ANSI/NFPA 70, latest edition
and any additional national, state or local codes.
-
In Canada, CSA C22.1 Canadian Electrical Code
Part 1 and any local codes.
-
Wiring must be N.E.C. Class 1. If original wire as
supplied with boiler must be replaced, type 105°C
wire or equivalent must be used. Supply wiring to
boiler and additional control wiring must be 14 ga.
or heavier.
-
Provide electrical ground at boiler as required by codes.
WARNING
Electric shock hazard. Can cause severe personal injury
or loss of life if power source, including service switch on
boiler, is not disconnected before installing or servicing.
All field supplied nominal 120VAC voltage wiring
H
must be sheathed in a flexible metal conduit.
Disconnect means, overload protection and low water
H
cut-off must be provided as required by local codes.
Connect incoming line voltage HOT (L1) wire to
H
terminal L1, and N to terminal L2 of the Hydrostat
3250-Plus control (see wiring diagram).
*GeniSys control with post purge (factory default setting
30 seconds)
-Can be field adjusted; see Beckett burner manual
Burner Set-up
(continued)
31

Advertisement

Table of Contents
loading

Table of Contents