Connection Of The Cooling Pipes To The Machine - Mitsubishi Electric MEGR Manual

Air conditioners for it cooling
Table of Contents

Advertisement

WARNING:
It is necessary to integrate the refrigerant and lubricating oil charge for the connection pipes and for
the remote air-cooled condenser.
For the quantities requiring reintegration, refer to the internal unit manual.
4.4.8

Connection of the cooling pipes to the machine

Ball valves for cooling line. The taps are supplied as an optional assembly kit.
ODS
PS
PED.
connections
Ø [mm]
[bar]
12
50
Art. 4.3
16
50
Art. 4.3
18
50
Art. 4.3
22
50
Art. 4.3
28
50
Art. 4.3
35
50
4.4.8.1
Connection of the cooling pipes to the remote condenser
The ball valves must be installed on the remote condenser. Taps are not included in the supply, but can be purchased as an
accessory.
The remote condenser is charged with inert gas (nitrogen) for tightness testing. Discharge the condenser via the appropriate valve.
Installation, use and maintenance manual
H
L
[mm]
[mm]
48
121
55
139
55
139
70
175
79
204
II
100.5 213
Panel to be removed to access the manifolds
28

Advertisement

Table of Contents
loading

Table of Contents