Rigging

18
Figure 3-3. Installation Clearance – 200/220XE, 200/220/250/280XE-HSE
Figure 3-4. Installation Clearance – Multi-Unit
Note: In case of the height of enclosure around the unit higher than 1.5m, contact Trane local
office.
No obstructions to outdoor fan airflow exit, including ductwork.
If the unit location requires a variance to the clearance dimensions, or any walls or enclosure
around the unit, contact your Trane sales office representative.
Locate the unit near a large capacity drain for water drain from evaporator during shutdown or
repair, or the condensate water generated by coil during defrost. A drain connection is located at
the bottom of the evaporator waterbox. Also, remove the vent plugs at the top of the waterbox to
facilitate complete drainage. All local and national codes apply.
Hazardous Voltage!
No stagnant water on the installation site, and the water drainage pipes must be ensured to
prevent water from entering the electric control box.
Failure to do so may result in equipment damage, electricity leakage, personal injury, or death.
On installations where low ambient temperature application is intended and snow
accumulations are expected, additional elevation must be provided to ensure electrical safety.
Refer to lifting instruction label on the unit, a specific lifting method is recommended as follow:
1.
The equipment should be moved by lifting. Do not use forklift truck to move or lift the unit.
2.
The cables, chains, slings and Lifting beam crossbars must be provided by crane operator
and attached on the lifting points. As
weights and center of gravity
NOTICE
WARNING
Figure 4. RTXC-XE/XE-HSE
dimensions.
Rigging,
Table 2. Unit lifting
RTXC-SVX003D-EN