IBM 5225 Operator's Manual page 74

Table of Contents

Advertisement

Follow these steps to run the Test:
Attention and Ready lights:
Q
Off
On
Step 1
Place the Mode Switch in the
Test postion.
Step2
If the printer power is not on, switch
it on and wait until the automatic test
is
completed (approximately 30
seconds).
Step3
Press the Stop Reset key.
Step4
Press the Start key.
Step 5
Observe the status indicator.
(Test
is
completed when
0 appears. To run test
again, press the Start key.)
Mode Switch
0
D
Stop
Reset
One Line
D
Start
e
0
Ready
Density Code
IOcp1a16lp1
l!>cp1al 6 lp1
10cp1al Blp1
1!>cp1i1l 8lp1
Ho5t
Sy~lem
Co"1rol
[[]
An example of a page of test data is shown on the next page.
Operating Procedures
5-11

Advertisement

Table of Contents
loading

Table of Contents