Test Run Of Indoor Unit - Toshiba MMD-UP0721HFP Series Service Manual

Table of Contents

Advertisement

10-3. Test run of indoor unit

Cooling/Heating test run check
The test run for cooling/heating can be performed from either indoor remote controller or outdoor interface
P.C. board. Refer to the Installation Manual and Service Manual of outdoor unit for the procedure of the test
run from an outdoor interface P.C. board.
In case of wired remote controller
<RBC-AMT32E>
TEMP.
TIMER SET
TIME
FILTER
1,
RESET
TEST
SET
CL
5
Procedure
Push [TEST] button for 4 seconds or more.
1
[TEST] is displayed at the display part and
the mode enters in TEST mode.
2
Push [ON/OFF] button.
Change the mode from [COOL] to [HEAT] using [MODE] button.
• Do not use [MODE] button for other mode except
3
[COOL]/[HEAT] modes.
• The temperature cannot be adjusted during test run.
• The trouble detection is performed as usual.
After test run, push [ON/OFF] button to stop the operation.
4
(Display on the display part is same to that in Procedure
Push [TEST] button to clear the TEST mode.
5
([TEST] display in the display part disappears and
status becomes the normal stop status.)
Note) The test run returns to the normal operation after 60 minutes.
2,
ON / OFF
4
FAN
MODE
3
SAVE
VENT
SWING/FIX
UNIT LOUVER
<RBC-AMS41E>
TEMP .
FILTER UP/DN
PROGRAM DAY
1,
FLT.RESET TEST
5
Operation contents
1
.)
- 33 -
ON / OFF
SCHEDULE
FAN
MODE
TIME
SAVE
VENT
SET
CL
SWING/FIX
UNIT
LOUVER
TEST
TEST
2,
4
3

Advertisement

Table of Contents
loading

Table of Contents