7-4. Test operation of indoor unit

Cooling/Heating test run check
The test run for cooling/heating can be performed from either indoor remote controller or outdoor interface
P.C. board.
1. Start/Finish operation of test run
Test run from indoor remote controller
Wired remote controller: Refer to the below item of "Test run" of the wired remote controller.
Wireless remote controller: Refer to the next page item of "Test run" of the wireless remote controller.
In case of wired remote controller
<RBC-AMT32E>
TEMP.
TIMER SET
TIME
FILTER
1,
RESET
TEST
SET
5
Procedure
Push [TEST] button for 4 seconds or more.
1
[TEST] is displayed at the display part and
the mode enters in TEST mode.
2
Push [ON/OFF] button.
Change the mode from [COOL] to [HEAT] using [MODE] button.
• Do not use [MODE] button for other mode except
3
[COOL]/[HEAT] modes.
• The temperature cannot be adjusted during test run.
• The trouble detection is performed as usual.
After test run, push [ON/OFF] button to stop the operation.
4
(Display on the display part is same to that in Procedure
Push [TEST] button to clear the TEST mode.
5
([TEST] display in the display part disappears and
status becomes the normal stop status.)
Note) The test run returns to the normal operation after 60 minutes.
ON / OFF
FAN
MODE
SAVE
VENT
CL
SWING/FIX
UNIT LOUVER
2,
4
FILTER UP/DN
3
PROGRAM DAY
1,
FLT.RESET TEST
5
Operation contents
1
.)
– 35 –
<RBC-AMS41E>
TEMP .
ON / OFF
SCHEDULE
FAN
MODE
TIME
SAVE
VENT
SET
CL
SWING/FIX
UNIT
TEST
TEST
2,
4
3
LOUVER

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents