Regency City Series New York 72 Manual page 12

Table of Contents

Advertisement

CITY SERIES
installation
1.
2.
3.
Frame opening for vent
Screw Chase vent to Framing
Use at least 4 sets of screws
(See Vent Framing Clearances Page)
to keep the vent at against framing
4.
5.
6.
Drywall
Frame wall with nishing material
If necessary, mark where the
Cut hole in nishing material
chase vent is located before
around inside of chase vent.
fixing dr wall in place
Finish edges around opening
3
01.23.18
919-830b
| City Series CV72E
38

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cv72e-ngCv72e-lp

Table of Contents