Toro Greensmaster 04251 Owner's Manual page 13

11 and 14-blade cutting unit
Table of Contents

Advertisement

1. Bearing-housing nut
2. Reel drive belt
4.
Using a 16 mm (5/8 inch) wrench, rotate the
bearing housing to make sure it operates freely.
5.
Remove the belt
6.
Using the chart shown on the decal in
determine the clip setting you want and which
pulleys you will need to move.
Note:
Each pulley is numbered (22, 24, and
25). Move the pulleys to the positions indicated
in the chart for your clip setting.
7.
Loosen the 2 set screws on each pulley you
need to move using a hex wrench.
8.
Remove each pulley.
9.
Install each pulley in the new configuration as
indicated on the decal
Note:
Ensure that the setscrews on each pulley
are positioned to align with the key and flat area
on the shaft.
10.
Torque the setscrews to 8.3 to 8.9 N-m (74 to
79 in-lb).
Figure 17
3. Compression spring
(Figure
17).
Figure
Figure 18
(Figure
18).
11.
Install the belt.
12.
Ensure that the compression spring is applying
tension to the belt
13.
Tighten the bearing-housing nut.
14.
Install the belt cover.
g017116
18,
decal131-1820
13
(Figure
17).

Advertisement

Table of Contents
loading

This manual is also suitable for:

Greensmaster 04252Greensmaster 04253Greensmaster 04254

Table of Contents