Download Print this page

One Stop Gardens 47712 Owner's Manual & Safety Instructions page 6

Advertisement

Treated Wood Base Foundation
1. Frame is assembled out of 4 x 6 and 2 x 12
treated lumber, hardware (including galvanized
lag bolts/deck screws), and fill material,
such as gravel (sold separately).
2. Assemble 2 x 12 pieces to dimensions shown
(See Figure C.) Trim wood to fit. Confirm
assembly is square and level; if needed, fill under
sections of base to level. Diagonal dimensions
from outside corners should be 122-1/8".
L-Brackets
75-1/4"
(Top & Bottom)
Figure C: Wood Base Dimensions
Fill Material
Fill Material
(inside greenhouse)
(inside greenhouse)
Page 6
12"
97"
Front Floor
Plate (17)
Door
Side
Ground
Figure D: Treated Wood Base - Cross Section
For technical questions, please call 1-888-866-5797.
3. Assemble 4 x 6 pieces on top of 2 x 12
base as shown (See Figure D.)
4. Fill base with fill material to top of 4 x 6 pieces.
5. Match Floor Plates (16, 17, 34) (See page 8)
lengths to frame base edge lengths. Place
Front Floor Plate (17) on door side of base.
NOTE: Position Floor Plates (16, 17, 34) with their outer
edges overhanging frame outer edges. (See Figure D.)
Do not secure Floor Plates to frame at this time.
Fill Material
Fill Material
(inside greenhouse)
(inside greenhouse)
Ground
Rear/Side Floor
Plates (16,34)
Door
Side
Item 47712

Advertisement

loading

Related Products for One Stop Gardens 47712