Removal and reinstallation of the operation panel or the front covers....................................................................23
2.3
Installation of the inverter and enclosure design ....................................................................................................26
Main circuit terminals ..............................................................................................................................................41
2.6
Control circuit..........................................................................................................................................................48
2.7
Communication connectors and terminals..............................................................................................................65
2.8
Connection to a motor with encoder (Vector control) .............................................................................................69
2.9
Parameter settings for a motor with encoder..........................................................................................................75