Bradford White Magnum D75T125E3N Installation & Operation Manual page 12

Gas-fired commercial water heater
Table of Contents

Advertisement

UNPACKING
INSPECT SHIPMENT carefully for any signs of damage.
1.
All equipment is carefully manufactured, inspected and packed.
2.
Any claims for damage or shortage in shipment must be filed immediately with the manufacturer noted on the
rating plate label.
LOCATE WATER HEATER in front of final position before removing crate.
1.
LOCATE so that venting connections will be short and direct.
2.
THIS WATER HEATER IS SUITABLE FOR INSTALLATION ON COMBUSTIBLE FLOOR. The thermal break leg
kit supplied with the water heater must be used.
3.
Proper venting practices must be considered when selecting a location for this water heater. For exact venting
specifications, please consult the Venting section of these Installation and Operating Instructions.
4.
It is recommended that a minimum clearance of four (4) inches (10.2 cm) be provided on the side of the water
heater for servicing and maintenance of the combination temperature and pressure relief valve.
5.
Increase distances to provide clearance for servicing.
Input
Less than or equal to 300,000 BTUH
Greater than 300,000 BTUH
Front, sides
and Rear "A"
2 in. (5.1 CM)
6 in (15.2 CM)
12

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents