Ariens Sno-Thro Deluxe Track 24 Operator's Manual page 11

Table of Contents

Advertisement

3
OS7061
1. Chute Crank
2. Gear Cover
3. Control Panel
4. Spring Pin Clip
Figure 5
4. Insert the short end of the chute rod into
the hole in the front of the control panel.
5. Connect the chute crank to the pinion
gear on chute with spring clip.
6. Orient the chute and pedestal to its most
vertical position and tighten pedestal
hardware to 20 – 42 N•m (Figure 5).
4
1
2
Remote Deflector Control
(921306, 307, 311, 312)
(Figure 6)
Connect the cable end to the cable anchor on
the discharge deflector before clipping the
cable to the cable bracket on the discharge
chute.
1. Route deflector remote cable along the
left side of the chute pedestal.
2. Insert the barrel on the cable end into
the bracket on left side of chute deflector
(Figure 6).
3. Hold seal out of the way while routing
the cable through the bracket on the left
side of the discharge chute, and then
push the cable fitting into the bracket.
4. Push the seal securely over the end of
the cable fitting to prevent water from
entering the cable.
Check deflector travel. Adjust nut on cable
end under handlebar to obtain full travel, if
necessary (see Remote Deflector Control on
page 23).
2
5
4
1. Cable Anchor
2. Cable End
3. Deflector Cable
4. Cable Fitting
5. Cable Bracket
GB - 11
3
1
3
Figure 6
OS7070

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents