Configuration 2 - Cadel RIVERIDRO 16 T2 Installer Manual

Pellet thermostove
Hide thumbs Also See for RIVERIDRO 16 T2:
Table of Contents

Advertisement

Hydraulic diagram
LEGEND

8.11 CONFIGURATION 2

8.11.1 System with: direct pellet stove and room probe or external thermostat** (optional) with internal DHW
production
All activities relating to electrical connections in the electronic board must be carried out by
authorised personnel.
26
new RIVER IDRO T2 - TESIS Airtight T2 - MIRA T2 - MAYA idroT2
SETTING
CONFIGURATION
Fig. 64 - Configuration 1
Fig. 64
1
Anti-condensation valve
2
External thermostat
3
Room probe
4
Electronic board
5
Stove
6
Zone valve
7
Expansion vessel
Wiring diagram for connecting external thermostat and zone valve (in the case of several val-
A
ves, connect in parallel)
B
Wiring diagram for connecting the external thermostat
VALUES
1

Advertisement

Table of Contents
loading

Table of Contents