Install The Dd9800 System Into A Rack; Attach Front Rail Adapter - Dell EMC Data Domain DD9800 Installation Manual

Installation and storage expansion guide
Hide thumbs Also See for EMC Data Domain DD9800:
Table of Contents

Advertisement

● Two people may be required to attach the rail/bracket assembly to the rack.
5. Install the screws supplied in the adapter kit to the rack. For example, the 10-32 threaded hole rack would require the
installation of the 10-32 screws. Install the screws in the appropriate locations until they are tight against the rack.
6. As needed, select the bracket marked right or left. Orientation assumes you are facing the front of the rack.
7. Slide the adjustable part of the bracket partly open.
8. Attach the first rail to the rack as follows:
a. Hold the rail against the inside of the rack with the rear bracket flush with the rear of the rack. Use the screws threaded
into the rack to hold the rear of the rail kit in place.
b. Pull the front of the rail until it is flush with the inside of the rack front.
c. Attach the rails to the rack by installing the appropriate nuts onto the screws threaded into the rack. Use the supplied
wrench to tighten the nuts. Do this for the front and rear of the rail kit.
d. Attach the rear of the rail/bracket assembly to the rear of the rack. Secure each screw.
Figure 13. Attach front rail adapter
9. Repeat the steps for the second rail.
10. After installing both rails, make sure that they are level with one another.
11. For HA systems, repeat this procedure for the second node.

Install the DD9800 system into a rack

About this task
CAUTION:
Data Domain systems are heavy. Always use two people or a mechanical lift to move a system. The
chassis displays warning signs.
Install the System in the Rack
19

Advertisement

Table of Contents
loading

Table of Contents