Suzuki DF115BG 2021 Owner's Manual page 59

Table of Contents

Advertisement

NOTE:
• When pushing the SELECT switch to select
station, continue to push SELECT switch until
the buzzer sounds one short beep.
• If failed to switch from the 2nd station to the
1st station, turn off the power and wait for 20
seconds, and then turn on the power again.
• Consult your authorized Suzuki marine
dealer if the station can not be selected.
SELECT
1 Lever Switch (Dual top mount remote
control box only)
This switch allows to control all engines with the
PORT side handle.
When all engines can be controlled by PORT
side handle, the 1 LEVER LED comes on.
When PORT engine group and STBD engine
group can be controlled by each handle, the 1
LEVER LED goes out.
The 1 LEVER switch is only enabled when the
all remote control handle is in the neutral posi-
tion.
NOTE:
• When turn on the power, 1 lever control mode
is automatically canceled.
• By operating this switch with the remote con-
trol handle in positions other than the neutral,
the buzzer sounds.
1 LEVER
56
BEFORE ATTEMPTING TO START THE
ENGINE
1. The motor has been lowered into the water.
2. The fuel hose is securely connected to the
fuel tank and the motor.
3. Direct the pilot water hole to the position you
intend.
4. Ensure that the boat fuel tank is correctly
vented and that any in-line filters are free of
dirt etc. If fuel tank filler cap has a manual
vent, be sure that it is fully open.
Fuel hose

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Df140bg 2021

Table of Contents