4. Lift the bagger top and install the bags by sliding the
bag frame hooks onto the retaining brackets
21).
4
3
G005672
Figure 21
1. Bag
2. Bagger frame
5. Lower the bagger top onto the bags
Figure 22
6. Install the upper bagger tube by inserting the curved
end into the opening in the bagger top.
Note: Make sure the flared end with the retention
post is pointing down and froward in preparation to be
mated with the Finishing Kit.
(Figure
1
2
3. Retaining bracket
4. Bag frame hook
(Figure
22).
G005757
5
Installing the Cutoff Baffle
No Parts Required
Procedure
Note: Certain models will have the cutoff baffle installed
(Figure
23). Proceed to the next procedure if a cutoff baffle
is installed.
Important: The cutoff baffle was shipped with the
machine as a loose part.
1. Install the cutoff baffle to the mower deck with 2 bolts
(5/16 x 3/4 inch) and 2 lock nuts (5/16 inch)
23).
2. Torque the fasteners to 7-9 N∙m (14-18 ft-lb).
1
2
3
1. Bolt (5/16 x 3/4 inch)
2. Cutoff baffle
12
G015321
Figure 23
3. Lock nut (5/16 inch)
(Figure