To Connect The Changeover To External Heat Source - Daikin EPRA18DAW1 Installer's Reference Manual

Hide thumbs Also See for EPRA18DAW1:
Table of Contents

Advertisement

8.3.8 To connect the changeover to external heat source

EPRA14~18DAV3+W1 + ETVZ16S18+23DA6V+9W
Daikin Altherma 3 H HT F
4P587503-1A – 2020.01
2
1
X2M
7
9
A4P
Y2
YC
A
B
A
B
a
Installation of EKRP1HBAA is required.
b
Prewiring between X2M/7+9 and Q1L (= thermal protector backup heater). Do NOT change.
3 Fix the cable with cable ties to the cable tie mountings.
Wires: 2×0.75 mm²
Maximum load: 0.3 A, 250 V AC
Minimum load: 20 mA, 5 V DC
[9.C] Bivalent
1 Open the following (see
1 Top panel
2 User interface panel
3 Upper switch box cover
2 Connect the changeover to external heat source cable to the appropriate
terminals as shown in the illustration below.
1+2
Wires connected to the alarm output
3
Wire between X2M and A4P
A4P
Installation of EKRP1HBAA is
required.
3
7
b
7
9
X2M
A4P
a
"6.2.5 To open the indoor
8
Electrical installation
|
Y2
4
unit" [
 50]):
Installer reference guide
1
3
2
101

Advertisement

Table of Contents
loading

Table of Contents