Connecting To The Dte - Paradyne FrameSaver SLV 9626 Installation Instructions Manual

Hide thumbs Also See for FrameSaver SLV 9626:
Table of Contents

Advertisement

Connecting to the DTE

1. Connect one end of the DTE's V.35 cable to the data port.
2. Plug the other end of the cable into the DTE.
3. Tighten the screws on each side of the connector to secure them.
POWER
Verification Check:
Is the port OK LED on?
– If yes, the port is ready to communicate.
– If no, check that both ends of the V.35 cable are properly seated and secured.
Check Health and Status messages in the left column of the System and Test
Status screen for messages.
Main Menu
– If System Operational appears, the Port-1 interface is set up correctly and
is operational.
– If System Operational does not appear, refer to the status information in
Displaying System Information of the User's Guide.
NOTE:
When any error conditions are detected, a status message will appear at the
bottom right corner of the screen.
COM
DTE
Status
System and Test Status
NET
MDM
DBM
99-16480
14

Advertisement

Table of Contents
loading

Table of Contents