Screw (quantity)
M3 x 5 mm, Nickel coated (4)
NVlink bridge
Prerequisite
Before you start, read
Generic Safety and Compliance Notices
Note: The NVLINK bridge is shipped in an accessary box within the computer carton box. You need to take
it out from the packaging and install it by yourself.
For access, do the following:
1. Remove the side panel. See "Side panel" on page 52.
Installation steps
Install the NVlink bridge.
Torque
Color
Black
5.0 ± 0.5 lb/in
, and print the following instructions.
.
Chapter 6
Hardware removal and installation
85