Preparation Before Construction 1.1.Scope Of Delivery - Delta R4E Installation Manual

Power monitor for energy storage system
Hide thumbs Also See for R4E:
Table of Contents

Advertisement

1.Preparation before construction
1.1.Scope of Delivery
Verify that following items are available for use prior to using this feature.
■ Wired Set (S4E_1P)
No
Product name
Power Monitor
1
Wall Surface /
2
Desktop Mounting Plate
Wood screws (+) for Wall Surface /
3
Desktop Mounting Plate
(dia. 4 x 20 mm)
4
AC Adapter
5
Power Meter
6
End Crimp Terminals
7
Isolation Cap (Red)
8
DIN Rail
Wooden Screws
9
for the Enclosed DIN Rail
10
Stopper
Enclosed Measuring
11
Unit Connector
※( )is amount of spare parts.
Shape
Qty
1 unit
POWER MONITOR
This is a plate used to install
1 pc
the Product on a wall or on a
desk.
These are wood screws for
2 pcs
the Wall Surface / Desktop
Mounting Plate.
This is the power supply for
1 unit
the Power Monitor.
1 unit
2 pcs
※ (1)
For power meter.
2 pcs
※ (1)
1 pc
For power meter and N1.
2 pcs
Wooden Screws
The stopper for power meter
2 pcs
and N1.
The RS-485 connector for
1 pc
power meter.
9
Preparation before construction
Remarks

Advertisement

Table of Contents
loading

Table of Contents