9 Electrical installation
In this chapter
9.1 About connecting the electrical wiring
9.1.1 Precautions when connecting the electrical wiring
EPRA14~18DAV3+W1 + ETVZ16S18+23EA6V+9W
Daikin Altherma 3 H HT F
4P644739-1 - 2021.02
9.1
9.1.1
9.1.2
9.1.3
About electrical compliance ..................................................................................................................................
9.1.4
9.1.5
9.2
Connections to the outdoor unit............................................................................................................................................
9.2.1
9.2.2
9.3
Connections to the indoor unit ..............................................................................................................................................
9.3.1
9.3.2
9.3.3
To connect the shut-off valve ................................................................................................................................ 101
9.3.4
9.3.5
9.3.6
To connect the alarm output ................................................................................................................................. 104
9.3.7
9.3.8
9.3.9
9.3.10
9.3.11
To connect a Smart Grid ........................................................................................................................................ 110
9.3.12
9.4
Before connecting the electrical wiring
Make sure the water piping is connected.
Typical workflow
Connecting the electrical wiring typically consists of the following stages:
▪
"9.2 Connections to the outdoor
▪
"9.3 Connections to the indoor
DANGER: RISK OF ELECTROCUTION
WARNING
ALWAYS use multicore cable for power supply cables.
INFORMATION
Also read the precautions and requirements in the
4
precautions" [
4
unit" [
87]
4
unit" [
94]
10].
9
Electrical installation
|
"2 General safety
Installer reference guide
83
83
84
85
86
86
87
87
93
94
97
98
83