Loose Parts Bag Contents; Minimum Clearances To Combustible Materials - Carrier 120 Series Operating Instructions Manual

Condensing gas furnace
Table of Contents

Advertisement

Drain Extension Tube (Z---pipe) (Provided separately in furnace)
POSITION
Front (Combustion air openings in furnace and in structure)
Required for service
All Sides of Supply Plenum
Top of Furnace
* Consult local building codes.
Table 1 – Factory- -Supplied Installation Parts
DESCRIPTION
Air Intake Pipe Flange
Vent Pipe Flange
Coupling Flange Gaskets
Sharp Tip Screws (Vent and Inlet Flanges)
Vent Pipe Coupling
Vent Pipe Coupling Clamps
Rubber Drain Elbow
Drain Tube Clamps
1/2---in. CPVC to 3/4---in. PVC Pipe Adapter
Gas Line Grommet
Junction Box Cover
Junction Box Base
Green Ground Screw
Blunt Tip Screws (Junction Box)
Thermostat Wire Grommet
Table 2 – Minimum Clearances to Combustible Materials for All Units
Rear
Sides
Vent
CLEARANCE
0 (0 mm)
1 in. (25 mm)
*24 in. (610 mm)
*1 in. (25 mm)
0 (0 mm)
0 (0 mm)
1 in. (25 mm)
7
QUANTITY
1
1
2
10
1
2
1
4
1
1
1
1
1
3
1
1

Advertisement

Table of Contents
loading

This manual is also suitable for:

59mn7a

Table of Contents