Toshiba RAS-25E2KVG-ND Service Manual page 106

Table of Contents

Advertisement

No.
Part name
Electronic expansion
9
valve coil
Fan Guard
!
Procedures
1. Detachment
1) Perform step 1 in 1 , all the steps in 2 and
1 in 5 .
2) Turn the coil by 180 degrees then remove
by pull it upward.
Attachment
2.
1) Insert the coil at position which
perpendicular with pipe of PMV then turn
the coil by 180 degrees.
Make sure that lead wire of coil
is opposite with pipe of PMV
1. Detachment
1) Perform work of item 1 of 2 .
2) Remove the front cabinet, and put it down
so that fan guard side directs downward.
Perform work on a corrugated cardboard,
cloth, etc. to prevent flaw to the product.
3) Remove the hooking claws by pushing
minus screwdriver according to the arrow
mark in the right figure, and remove the
fan guard.
2. Attachment
1) Insert claws of the fan guard in the holes of
the front cabinet.
Push the hooking claws (9 positions) by
hands and fix the claws
All the attaching works have completed.
Check that all the hooking claws are
fixed to the specif ed positions.
- 106 -
Remarks
Rotate 180°
BODY-PMV
COIL-PMV
Minus screwdriver
Hooking claw

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ras-35e2kvg-ndRas-25e2avg-ndRas-35e2avg-nd

Table of Contents