MULTIQUIP LT6k Operation Manual page 41

Light tower/generator
Table of Contents

Advertisement

4. After draining the coolant, close drain plugs and fill
with tap water.
5. When the water level is near the mouth of the water
filler, open drain plugs and start the engine, and run
at low idling. Keep the engine running at low idling and
flush the radiator for about 10 minutes.
6. Adjust the flow of the water flowing in and draining
out to ensure that the radiator is always full during the
flushing operation. While flushing water through the
system, make sure the water inlet hose does not come
out of the radiator filler port.
7. After flushing, stop the engine, open drain plug and
drain the water, then close drain plugs.
8. After draining the water, flush the system with a flushing
agent. See instructions on flushing agent label.
9. After flushing, open drain plugs and drain out all the
water, then close drain plugs and add tap water so the
water level is near the mouth of the water filler.
10. When the water level is near the mouth of the water
filler, open drain plugs and start the engine, run at low
idling and continue to flush the system until clean water
comes out. Adjust the flow of the water flowing in and
draining out to ensure the radiator is always full during
the flushing operation.
11. When clean water comes out, stop the engine, drain
all the water, then close drain plugs.
12. Remove the corrosion resistor (if equipped) and open
valve.
13. Fill radiator with water using a 50/50 coolant/water
ratio mixture of 50% coolant concentrate and 50%
demineralized water.
14. Fill radiator to the top of the radiator filler neck, then
tighten radiator cap.
LT6K LIgHT TOWeR • OpeRaTIOn manuaL — Rev. 2 (09/11/14) — page 41
CHeCK CaBLe WeaR
The wire rope (cable) that raises and extends the mast is
a very important part of the light tower. There is one cable/
hand winch system, located on the tongue of the trailer, that
raises and extends the light tower mast. There is a second
cable/hand winch system located on the mast that serves to
raise and lower the three extendable sections of the mast.
dangeR
Wire rope (cable) will fail if it is worn, frayed, misused,
crushed, kinked or damaged in any way. ALWAYS
check the cables and pulleys for any abnormalities
before use.
dO nOT use it if there is even the slightest cause for
concern and replace any damaged cables or pulleys
immediately.
seRvICIngTHe masT RaIse/LOWeR CaBLe sYsTem:
To replace any components in the mast raise/lower cable
system (Figure 32), use the following steps:
Figure 32. Mast Raise/Lower Cable System
1. Lower the mast to the horizontal resting position.
2. Inspect the cable clamps, pulleys, and other components
for worn or damaged parts.
3. Disconnect the cable from the ball socket pin and
remove from the mast pulley and cable sheave. Detach
the cable from the hand winch as necessary.
4. Replace the pulley and the cable as needed.
maintenance

Advertisement

Table of Contents
loading

Table of Contents