Task 1: Order Line Provisioning; Task 2: Ip Addresses; Task 3: Boot Sequence - Bay Networks 5399 Quick Start Manual

Remote access concentrators
Hide thumbs Also See for 5399:
Table of Contents

Advertisement

Task 1: Order Line Provisioning

The lines are ordered through the telco before the RAC is installed.
Typically this is done after the sales order is placed. The supported switch
types and switch parameters are described in Provisioning WAN Lines
for Remote Access Concentrators. You should have the switch type and
parameter values before continuing with the install.

Task 2: IP Addresses

You must be prepared to enter the following addresses during the
configuration procedure:
Internet address
Subnet mask
Broadcast address
Preferred load host
Preferred dump host
Load/Dump gateway address

Task 3: Boot Sequence

You must decide which boot sequence you want to use. You can choose
a network boot (net), self boot (self), or both. Typically, you would select
both (net and self).
Quick-Start Guide for Remote Access Concentrators
118352-A Rev. A
3

Advertisement

Table of Contents
loading

This manual is also suitable for:

8000

Table of Contents