2.
Remove the protective foam from the connector guide pins on the back of the 4Gb SAN
Switch.
Figure 6
Removing the protective foam from the connector guide pins.
3.
Plug the 4Gb SAN Switch into the back of the BladeSystem server enclosure; it will mate
with the installed Interconnect switch. Be sure that the handle of the 4Gb SAN Switch is on
the left when inserting the 4Gb SAN Switch and that the handle latch is fully engaged
after installation. See
Figure 7
Installing the 4Gb SAN Switch
4.
Install the transceivers and cable into the 4Gb SAN Switch (see
a. Insert the SFP transceivers (1) into the FC switch ports. Install protective dust plugs on
transceivers without optical cables attached to prevent damage and contamination.
26
Installing the 4Gb SAN Switch
Figure
7.
Figure
8):