Horizontal Right - Trane 2TEE3F31A1000A Installer's Manual

Convertible variable speed - air handlers 2-1/2 - 5 ton
Hide thumbs Also See for 2TEE3F31A1000A:
Table of Contents

Advertisement

Installer's Guide
DOWNFLOW BAFFLE KIT
SCREWS TO
REMOVE COIL
7/8" GASKET
SECT. X-X
(TYP. BOTH SIDES)
WATER
BLOW-OFF
BAFFLES
ATTACH WITH
2 SCREWS
EACH SIDE
e. It is always recommended that an auxiliary drain
pan be installed under a horizontal air handler
(See Condensate Piping) to prevent possible dam-
age to ceilings.
f. Isolate the auxiliary drain pan from the unit or
from the structure.
g. Connect the auxiliary drain line to a separate
drain line (no trap is needed in this line) and ter-
minate according to national and local codes.
h. If a return duct is connected to the air handler, it
must be the same dimensions as the return
opening shown in the outline drawing on page
13.
i. On units with sheetmetal returns: Return
plenum should be flanged. Sheetmetal screws
must be 1/2" in length or shorter.
j. No sheetmetal screws may be used to attach
return ductwork on the side of the unit.
k. Openings where field wiring enters the
cabinet must be completely sealed.
6
7/8" GASKET
X
X
1/2" GASKET
INSIDE SURFACE
OF BAFFLE
WATER
DIVERTER
BAFFLES
(5-ton only)
DISCARD
DRIP TRAY
TRIANGULAR
BAFFLE
SCREWS TO
REMOVE COIL
FILL WITH SEALANT
For Maximum Efficiency on
Upflow and Downflow
Remove
and
Discard
Location of power entry is shown on the outline
drawing. Use 2.5" clear stickers provided to seal
all unused electrical knockouts. See Figure 8.
l. After ductwork connections are made, seal air-
tight and per Local codes.

HORIZONTAL RIGHT

a. For maximum efficiency and Customer ease of
filter maintenance, it is recommended that a
FRONT
SHIELD
Figure 9
Horizontal Left,
Replace
with
Narrow
Baffle
Figure 10
18-GE04D2-11

Advertisement

Table of Contents
loading

Table of Contents