Fsm7352S Rear Panel - NETGEAR ProSafe FSM7328PS Hardware Installation Manual

Managed stackable layer 3 fast ethernet switches
Hide thumbs Also See for ProSafe FSM7328PS:
Table of Contents

Advertisement

Managed Stackable Layer 3 Fast Ethernet Switches Hardware Installation Guide
Table 2-3. FSM7352S LED Description (continued)
Power
10/100M ports
One LED per port
10/100/1000M
ports
Three LEDs per
port
SFP Port
(1,000 Mbps only)

FSM7352S Rear Panel

The rear panel has a console port and a standard AC power receptacle for the
supplied power cord.
Console port
Figure 2-6
Introduction
Solid green: Power is supplied, and the switch is operating normally.
Blinking green: Runtime code load in progress.
Solid yellow: Power-On Self-Test (POST) in progress.
Blinking yellow: POST failure or CPU failure.
Off: Power is disconnected.
Link/ACT/SPD LED
• Off: No 10/100 Mbps link is established on the port.
• Solid green: A valid 100 Mbps link is established on the port.
• Blinking green: The port is sending or receiving packets at
100Mbps.
• Solid yellow: A valid 10 Mbps link is established on the port.
• Blinking yellow: The port is sending or receiving packets at 10
Mbps.
Link/ACT LED
• Off: No 10/100/1000 Mbps link is established on the port.
• Solid green: A valid 1,000 Mbps link is established on the port.
• Solid yellow: A valid 10/100 Mbps link is established on the port.
• Blinking green: The port is sending or receiving packets at
1,000 Mbps.
• Blinking yellow: The port is sending or receiving packets at
10/100 Mbps.
Stack LED
• Green: Stack port has a valid link connection.
• Off: Stack port does not have a valid link connection.
• Solid green: Link is up.
• Blinking green: The port is sending or receiving packets in link up
status.
• Off: No link is detected.
v1.0, May 2007
Power receptacle
2-7

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fsm7328sFsm7352psFsm7352s

Table of Contents