Ac Power Replacement Procedure; Manpower; Tools; Preparations - GE Vivid 7 Service Manual

Hide thumbs Also See for Vivid 7:
Table of Contents

Advertisement

GE H
EALTHCARE
D
FC091194, R
IRECTION
EVISION
Section 8-11

AC Power Replacement Procedure

8-11-1

Manpower

One person, 1 hour.
8-11-2

Tools

#2 Phillips screwdriver
Dangerous voltages are present in this equipment. Completely power off and
DANGER
shut down the scanner before servicing.
8-11-3

Preparations

1.) Shut down the system, see
2.) Remove Right Side Cover, see
3.) Remove Filter Cover, see
4.) Remove Lower Rear Cover, see
NOTE:
The Power Supply, as delivered in a Vivid 7, has been configured for either 115 VAC or 230
VAC. Do not interchange the two types and don't try to reconfigure the Power Supply for use
on another voltage; the Mains Circuit Breaker are different between the two types.
5.) Do this step if the intention is to change to another AC Power Supply:
-
8 - 82
11
4-2-3 "Power Shut Down" on page
"Upper Rear Cover Removal Procedure" on page
Record the voltage for the AC Power Supply being replaced (see label on rear of system).
___ - 115VAC or ___ - 230VAC.
Section 8-11 - AC Power Replacement Procedure
"Side Covers Removal Procedure" on page
"Lower Rear Cover Removal Procedure" on page
V
7 S
IVID
ERVICE
4-7.
8-4.
8-6.
8-10.
M
ANUAL

Advertisement

Table of Contents
loading

Table of Contents